Home World News Burial of hazardous waste | CMM removes protective humid environments for fixed

Burial of hazardous waste | CMM removes protective humid environments for fixed

7
0
Burial of hazardous waste | CMM removes protective humid environments for fixed


Montreal (CMM) Metropolitan Association changed an arrangement that excludes lands in Blainville in Blainville, so it can use it to bury dangerous waste remains.


The modification of the settlement, which was adopted in the unusual council on Tuesday, follows a proposal of the city of Blainville and CMM. On last Friday, two municipalities, 7.2 hectares of wetlands are ready to withdraw an area of ​​7.2 hectares, he said.

The area in question is a stone shooting from the current landfill. It is already relating to the Quebec government. In exchange for this withdrawal, the society undertakes to add an additional 123 hectare natural environment.

Since 2022, CMM-тостоветен Betland was designed to expand the future of Stablex activities in the 1990s. The purpose of this modification is to prevent the use of the homeowner in the Stablix, Blainville Peat Bog, where CMM is stored.

According to the CMM, this area is already in a violated natural environment. Its use would not continue to continue an area of ​​American company Blainville, which is confiscated in a short time.

What is Stabllix doing?

Every year, Stablikix serves about 600 companies in Quebec and other provinces and in the United States. Blainville’s facilities, polluted soils, asbestos, ovens, batteries and batteries, are treated to residual hazardous materials (MDR). The MDR comes from the electronic metallurgical, including a few sectors between galvanoplasty and chemistry.

Source: Stablic

Among the Quebec, the demonstration between the one hand and Blainville and CMM was strengthened in the last few weeks. At the end of February, the Minister of Natural Resources Maité Blanchette Vézina, the American company was forced to sell one of the land to open a new cameramon to bury the residual materials of Blainville 93.

The Quebec government justifies expropriation by the expatriation of the service to start a delay in a new landfill.

Stablix believes that the current burial cell will reach the full power in 2027.

The company maintains that they should be launched to draw trees before April 1525 and the rest of the service in the processing of dangerous materials.

The municipal world has reacted strongly to the confiscation. Blainville presented the confiscation of “a dangerous previous” for the autonomy of municipalities.

History so far

2020: Blainville, if the company acquires powers to create the next landfill, is a stable contract for the sale of Stablex with a price of 14 million.

22 August 2023: Blainville officials adopted a resolution to cancel the contract, believing that the project is contrary to the interests of Blainville citizens.

27 February 2025: Québec Desktop is a bill that wakes the risk of cutting service in the development of residual hazardous materials.

17 Mars 2025: CMM and Blainville threatened to protest the adoption of a law in court to build Blainville in Stablic Stablic.





Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here